Planroom
IS THERE A PROJECT THAT YOU THINK WE WOULD BE INTERESTED IN, OR, JUST WANT TO SEND OUT A MESSAGE TO OUR ESTIMATING TEAM. SEND AN EMAIL TO ESTIMATING@SML.CA . WE WOULD LOVE TO HEAR FROM YOU!!!!
Southgate Pump Replacement - Closing May 24th 2023
Project Name: Southgate Pump Replacement
Project Location: 5015 111 Street NW Edmonton AB
Project Description: Pump Replacement at Southgate Mall.
Estimating Lead: Dan Nickel
Close Date: May 24th 2023
Time: 2:00 PM MT
Addenda:
ENGINEER/CONSULTANT
Name: Smith & Andersen
OWNER: JLL
TYPE OF CLOSING: Stipulated Price
Tender Acceptance Period: 90 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: May 2023
Completion Date: October 2023
Warranty: 2 Years
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Edmonton Government Centre TP#03 - Closing May 31st 2023
Project Name: Edmonton Government Centre Tender Package #03
Project Location:9804 – 107 Street NW, Edmonton, Alberta
Project Description: Fountain, Reflecting Pool, and Plaza Decking Repairs/Replacement
Estimating Lead: Matt Stevenson
Close Date: May 31st 2023
Time: 2:00 PM MT
Addenda: 01, 02, 03, 04
ENGINEER/CONSULTANT
Name: GEC Architecture
OWNER: Alberta Infrastructure
TYPE OF CLOSING: Stipulated Price
Tender Acceptance Period: 60 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: 12-Jul-2023 (Refer to Appendix B Schedule)
Completion Date: 10-Sep-2024 (Refer to Appendix B Schedule)
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Stony Plain Provincial Building Boiler Replacement - Closing June 1st 2023
Project Name: Stony Plain Provincial Building Boiler Replacement
Project Location: Stony Plain, AB
Project Description: Work of this Contract comprises the following:
.1 Demolition, abatement, and safe disposal of waste.
.2 Purchase and installation of a new condensing boiler.
.3 Modification of the existing heating piping to a “primary / secondary”
distribution complete with new primary pumps.
.4 Modification to the existing building automation system to accommodate the
new boiler, pumps, and sensors.
.5 Modifications to the existing gas main, heating water mains, ducts, and
breeching.
.6 Modification and relocation of the existing domestic water heater and
domestic water piping.
.7 New and patch of piping insulation.
.8 Electrical wiring of new boiler and pumps.
.9 Replace all existing victaulic joints and seals on the hot water heating
distribution piping throughout the main floor of the building. Contractor to verify
locations of all Victaulic fittings on site. Victaulic fittings are location on main
floor only.
.10 Start-up, testing, and balancing of new heating installation.
.11 Electrical power requirements for upgrade.
.12 Integration of BACnet controls into existing Building Management System.
Other items that may be affected / required are ceiling removal / remediation, addition of access panels, painting of Mechanical Systems & roofing where necessary, concrete work.
Estimating Lead: Dan Nickel
Close Date: June 1st 2023
Time: 2:00 PM MT
Addenda: 01, 02, 03.
ENGINEER/CONSULTANT
Name: Arrow Engineering
OWNER: Alberta Infrastructure
TYPE OF CLOSING: Stipulated Price
Tender Acceptance Period: 35 Days
Bid Bond: 10% (By SML)
Performance Bond: 50% (By SML)
L&M Bond: 50% (By SML)
Start Date: Immediately Upon Award
Completion Date: September 30th 2023
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Woods Homes Cottage E - Closing June 1st 2023
Project Name: Woods Homes Cottage E
Project Location: 805 37 Street NW Calgary AB
Project Description: Construction of a new 10 bedroom group-home for the Woods group.
Estimating Lead: Dan Nickel
Close Date: June 1st 2023
Time: 2:00 PM MT
Addenda:
ENGINEER/CONSULTANT
Name: EMBE Consulting Engineers
OWNER: Wood’s Homes
TYPE OF CLOSING: Stipulated Price
Tender Acceptance Period: 30 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: June 2023
Completion Date: July 2024
Warranty: 2 Years
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Kelowna International Airport Terminal Expansion Post Tender Addendum 01 - Closing June 1st 2023
Project Name: Kelowna International Airport Terminal Expansion – Post Tender Addendum 01
Project Location: Kelowna, BC
Project Description:
- Expansion of the existing departures lounge into a hold room for domestic departures/ arrivals, with improved distribution of individual boarding gate areas and bag claim areas;
- New fixed links at Gates 7 and 8;
- Increased concessions (retail, food and beverage);
- Additional office and storage space for terminal operations and air carrier operations;
- Expansion of the PBS area to accommodate improved technology from Canadian Air Transport Security Authority (CATSA) with the potential and desire to incorporate CATSA Plus or similar advanced technologies and screening processes;
- Expansion of groundside concourse;
- New shipping/receiving area for deliveries including vehicle access;
- Widening of existing groundside concourse area adjacent to PBS to improve circulation and add opportunities for additional food, beverage and retail services;
- Incorporation of thermal internal heating and cooling systems;
- Elimination of sections of the existing airside corridor adjacent to the departures lounge space and provision for connectivity to existing gates and additional boarding gate ae areas;
- Relocation of underground services and utilities as required for the ATB expansion; and
- Improved groundside curbside and road access.
SITE WALK: April 27th, 2023 See the attached agenda in the Project Files. Please note which scopes have been scheduled for each time interval. Any trade not listed is encouraged to view existing areas of the terminal at their own discretion.
Estimating Lead: Matt Stevenson
Close Date: May 16th 2023
Time: 2:00 PM PST
- Post Tender Addendum 01; RFI Responses, Addendum 05 & Addendum 06
- Addenda: 01, 02, 03, 04
- RFI Responses 1, 2, 3, 4 & 5
ENGINEER/CONSULTANT
Name: OMB – Office of McFarlane Biggar
OWNER: City of Kelowna
TYPE OF CLOSING: Stipulated Price
Tender Acceptance Period: 60 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: 03-Jul-2023
Completion Date: 03-Jul-2025
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Affiliations
Strathcona Mechanical Limited (SML) is proud to be affiliated with the following organizations:
Ready to Start Working With Us?
Get in touch today to see how we can help with your upcoming project.