John J Bowlen Building - Air Handling Unit Replacement - Closing April 16th 2024
Project Name: John J Bowlen Building – Air Handling Unit Replacement
Project Location: 620 – 7 Avenue SW, Calgary AB, T2P 0Y8
Project Description:
- Disconnect, make safe, remove, and replace existing air handling units in the penthouse mechanical room as shown.
- Disconnect, make safe, remove, and replace existing pumps in the penthouse mechanical room as shown.
- Isolate/drain, remove, and replace existing control valves in the penthouse mechanical room as shown.
- Isolate/drain, remove, and replace existing pneumatic coil control valves on Mezzanine level with DDC variants, and connect to new/existing DDC controllers as necessary as shown.
- Disconnect, remove, and replace existing pneumatic thermostats with DDC variants as shown.
- Refurbish existing combustion make up air unit and replace heating coils.
- Any other scope indicated on drawings and specifications.
Estimating Lead: Matt Stevenson/ Danny Nickel
Close Date: April 16th 2024
Time: 2:00 PM MST
Addenda: 01, 02, 03, 04, 05
Clarification: 01, 02
ENGINEER/CONSULTANT
Name: AME Group
OWNER: Alberta Infrastructure
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 30 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: Commence work at the Place of the Work within 15 Days after date of commencement of Contract.
Completion Date: March 31st, 2025
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
TAZA Marketing Centre Phase 2 - Interiors - Closing April 23rd 2024
Project Location: 5894 Tsuut’ina Parkway, Calgary AB T0L 1W0, Canada
Project Description:
Interior components of Elan’s TAZA Marketing Centre project. Three separate areas are to be priced. The Marketing Office, Main Floor Elevator Lobby and 2nd floor lobby. Please ensure pricing is broken out for each specific area.
Estimating Lead: Matt Stevenson
Close Date: April 23rd 2024
Time: 2:00 PM MST
Addenda: 00
Clarification: 00
ENGINEER/CONSULTANT
Name: Dialog
OWNER:
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 30 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: Commence work at the Place of the Work within 15 Days after date of commencement of Contract.
Completion Date: March 31st, 2025
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
MCH HVAC Upgrades - Closing April 24th 2024
Project Location: 16940 87 Ave NW, Edmonton, AB T5R 4H5
Project Description: Substantial HVAC Upgrade to the Misericordia Community Hospital, focusing on the AHUs serving the Operating Room(s).
Estimating Lead: Dan Nickel
Close Date: April 24th 2024
Time: 2:00 PM MST
Addenda:
Clarification:
ENGINEER/CONSULTANT
Name: MCW Hemisphere Ltd.
OWNER: Covenant Health
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 60 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: TBD
Completion Date: TBD
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
UA Local 324 Headquarters - Closing April 25th 2024
Project Name: UA Local 324 Headquarters
Project Location: 2759 Leigh Road, Langford, BC
Project Description: The project scope is to develop a 2 storey building and site that will function as the headquarters, offices and training facility of the local union 324 (Plumbing & Pipe Fitters Union). All contractors shall be union companies, refer to specification and addendum 2 for more detail.
Estimating Lead: Dan Nickel
Close Date: April 25th 2024
Time: 2:00 PM Pacific
Addenda: 01, 02, 03, 04, 05, 06.
Clarification:
ENGINEER/CONSULTANT
Name: Avalon Mechanical
OWNER: UA324
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 60 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: TBD
Completion Date: TBD
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Devon Labs - Glycol System Modernization - Closing April 30th, 2024
Project Name: Devon Labs – Glycol System Modernization
Project Location: 1 Oil Patch Dr Devon, Alberta, T9G 1A8
Project Description:
Work of this Contract comprises the following:
.1 Heat Exchanger Replacement.
.2 Domestic Hot Water Heater Tank and Condensate Receiver Replacements.
.3 Water, Glycol, Domestic Hot Water Recirc. Pumps Replacements.
.4 Variable Air Volume (VAV) Boxes Replacements.
.5 Unit Heater Replacements.
.6 Heating Valves Replacements.
Estimating Lead: Dan Nickel/ Matt Stevenson
Close Date: April 30th 2024
Time: 2:00 PM Pacific
Addenda: 00
Clarification: 00
ENGINEER/CONSULTANT
Name: AME Consulting Group Ltd.
OWNER: Alberta Infrastructure
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 35 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: TBD
Completion Date: TBD
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Eversquare - Pharmasave & Medical Centre Tenant Fit Out - Closing May 2nd, 2024
Project Name: Eversquare – Pharmasave & Medical Centre Tenant Fit Out
Project Location: EVERSQUARE BUILDING ‘A1’ 4730 GATEWAY BOULEVARD NW EDMONTON, AB
Project Description: Tenant Fit Out for Pharmasave & Medical Clinic
Estimating Lead: Dan Nickel/ Matt Stevenson
Close Date: May 2nd, 2024
Time: 2:00 PM Pacific
Addenda: 01
Clarification: 01
ENGINEER/CONSULTANT
Name: Williams Engineering
OWNER: Ever Red Real Estate Developments
TYPE OF CLOSING: Stipulated Price Bid
Tender Acceptance Period: 30 Days
Bid Bond: No
Performance Bond: Provide Rates on Quotes over $1 Million
L&M Bond: Provide Rates on Quotes over $1 Million
Start Date: Summer 2024
Completion Date: Summer 2024
Warranty: 1 Year
Note: The lowest or any Tender will not necessarily be accepted.
Please provide bonding rates for all scopes over $1,000,000.00.
Affiliations
Strathcona Mechanical Limited (SML) is proud to be affiliated with the following organizations:
Ready to Start Working With Us?
Get in touch today to see how we can help with your upcoming project.